Armored Engineer Vehicles
Abstract
This project supports live fire test and evaluation, initial operational test and evaluation and production qualification testing of the Joint Assault Bridge (JAB). This project also funds efforts to upgrade and modernize the Assault Bridging Management portfolio through the development of new systems and enhancement of existing systems such as the M9 Armored Combat Earthmover (ACE) replacement.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2018
- Source ID
- EW8_0603804A_4_2040_PB_2018
Related Documents
- Root: Logistics and Engineer Equipment - Adv Dev
- Child Accomplishment: Joint Assault Bridge Testing
- Child Cost Item: eea58c4121c96d5010dd39cbf67ef3a0
- Child Cost Item: 96a56b677127fcedc047fd98440b9b7e
- Child Cost Item: 702345ff94912e6092d4fe5c5932b187
- Child Cost Item: f9b4c67d4245fed27a152e072b203b23