TACTICAL BRIDGING - ENGINEERING DEVELOPMENT
Abstract
This project supports the engineering, system development and demonstration, and transition to procurement of Future Force Tactical Bridge Systems. Efforts supported include the development, integration and testing of the Bridge Erection Boat (BEB) as well as development, integration and testing of the Line of Communication Bridge (LOCB). Other efforts supported include Bridging laboratory equipment used in the verification of product improvements to launch platforms as well as structural strength and fatigue testing of Bridging prototypes, development systems, and validation of design modifications. This project also includes the development and testing of light assault gap crossing capability, a remote controlled automatic launch for the Rapidly Emplaced Bridge System (REBS) and integrate and test the REBS on a Stryker chassis, and the development and testing of the Joint Assault Bridge (JAB) system.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2013
- Source ID
- H02_0604804A_5_2040_PB_2013
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: LOC Bridge POR Testing
- Child Accomplishment: JAB Development and Testing
- Child Accomplishment: BEB Testing
- Child Accomplishment: Development, integration, and testing of REBS Auto Launch-Retrieve with Common Bridge Transporter (CBT)
- Child Accomplishment: LOCB Development
- Child Cost Item: 4b85528bfc568bd0110d986a5a1a4dfa
- Child Cost Item: 61e62c31def9928ce699b72b00d678a8
- Child Cost Item: e18eb0ce3bab4a3291999907f00a7f37
- Child Cost Item: 9544bbdfdb3db27899a5e2b16238ccb6
- Child Cost Item: 0ee2bad3d47ef12ee38c24eede7e2110
- Child Cost Item: e52ec5be2e8f88e85a28d665ecde678e
- Child Cost Item: 88e1d2e0f3e9ee87145c9141d37dbe8f