Tactical Bridging - Engineering Development
Abstract
This project supports the engineering, system development and demonstration, testing and transition to procurement of Future Force Tactical Bridge Systems. Systems include the Joint Assault Bridge (JAB)and Line of Communications Bridge (LOCB). Other efforts supported include a Bridge Supplemental Set to provide better footing on muddy or soft soil conditions, as well as structural strength and fatigue testing of Bridging prototypes, development systems and validation of design modifications. This project also includes a remote controlled automatic launch for the Rapidly Emplaced Bridge System (REBS).
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2014
- Source ID
- H02_0604804A_5_2040_PB_2014
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: BEB Testing
- Child Accomplishment: Development, integration, and testing of REBS Auto Launch-Retrieve with Common Bridge Transporter (CBT)
- Child Accomplishment: JAB Development and Testing
- Child Accomplishment: SBIR+STTR
- Child Accomplishment: LOCB Development
- Child Accomplishment: Structural Health Monitoring
- Child Accomplishment: Bridge Supplemental Set
- Child Cost Item: 3f92efdfa0ed187583075e49e77791de
- Child Cost Item: 0ef6247e50d8a0da766674be74ff6d29
- Child Cost Item: fab15f74aa8f947c165c9f3fad18a6ad
- Child Cost Item: a035a2b05d5ab6092c111d6e8393fa87
- Child Cost Item: db9f27f64a7b2c73e5d2915ca583d102
- Child Cost Item: c123eea7ab5a33d7d3a7f7aa2caf0943
- Child Cost Item: 902db863f85f649dffff48f0cb137a56
- Child Cost Item: f9b0dcb147d114c92dfe2ca2127854c4
- Child Cost Item: 59bb5a48d3aebe24860628ec0bf28fa1
- Child Cost Item: cda2492de3e1b67c3316739d8a758ff7
- Child Cost Item: 2722a6d0c16284a00c7d6d34cbf5686d
- Child Cost Item: 8e3834f3c4f855a4e8294fc5b7e3984e