Tactical Bridging - Engineering Development
Abstract
This project supports the engineering and manufacturing development and transition to procurement of Future Force Bridge Systems and support equipment. Funding supports the Engineering and Manufacturing Development phases of the Joint Assault Bridge (JAB) and Line of Communication Bridge (LOCB). This project also funds efforts to upgrade and modernize the bridging fleet through the development of new systems (Bridge Supplemental Set, Structural Health Monitoring, Stryker Launched Assault Bridge) and enhancement of existing systems (weight class upgrades/up-ratings).
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2016
- Source ID
- H02_0604804A_5_2040_PB_2016
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: Joint Assault Bridge (JAB) Development and Testing
- Child Accomplishment: Rapidly Emplaced Bridge System (REBS) Auto Launch-Retrieve with the Common Bridge Transporter (CBT)
- Child Accomplishment: Line of Communication Bridge (LOCB) Development and Testing
- Child Accomplishment: Structural Health Monitoring System
- Child Accomplishment: Bridge Supplemental Set (BSS)
- Child Accomplishment: Bridging Weight Classification Upgrades
- Child Cost Item: f158a0c308c7378d87d54dc0c58854ff
- Child Cost Item: c9f663c4a2f67d5ea94cd1f43fecdd3d
- Child Cost Item: d0cedd6762b8c2fea830af1c856a1828
- Child Cost Item: b436c00ed251bbeed4c5c2647720fef0
- Child Cost Item: ceb1c654a32bb874598d9cf6195c2942
- Child Cost Item: aaa2cc9e726a0fada010a2806a93cb0c
- Child Cost Item: 05e085a1c7e245bf3725712cb3087ce8
- Child Cost Item: 2fefffe4b2e7f6a4a9aa8004c7e33b2b
- Child Cost Item: bd0fca1a038d51169288421eca5e1e79
- Child Cost Item: d9cfaed7f0d9a3ebd8379014758092d4
- Child Cost Item: 7a6811f77b1b026a460a022ae5988c89