Tactical Bridging - Engineering Development
Abstract
This project supports the engineering and manufacturing development and transition to procurement of Future Force Bridge Systems and support equipment. Funding supports testing associated with the Low Rate Initial Production (LRIP) phase of the Joint Assault Bridge (JAB) and development of the Line of Communication Bridge (LOCB). This project also funds efforts to upgrade and modernize the Bridging Product Management portfolio through the development of new systems and enhancement of existing systems.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2017
- Source ID
- H02_0604804A_5_2040_PB_2017
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: Joint Assault Bridge (JAB) Development and Testing
- Child Accomplishment: Line of Communication Bridge (LOCB) Development and Testing
- Child Accomplishment: Structural Health Monitoring System
- Child Accomplishment: Bridge Supplemental Set (BSS)
- Child Cost Item: 57de963bf27fbd6cd6a02b1575aff035
- Child Cost Item: 2043541139864c37ad1d9d60c12265b0
- Child Cost Item: bb175146d7c9013a951f4f696b59c199
- Child Cost Item: 42285fd9c6560c26749b59a9eb784be1
- Child Cost Item: 36433e5fbf84767b5799cc577f9e7001
- Child Cost Item: 586ec8abacbd1220147b75d4e03241cf
- Child Cost Item: 4b380b4dbdb77395eb69eab8aaf2c69c
- Child Cost Item: ad74ec5a1f2e56c05731442faa9bab1e
- Child Cost Item: 97a0f268376a21a68593475ac2112821
- Child Cost Item: d5582342b8c025e86d95fada0466df2f
- Child Cost Item: f3f6a26096fba986e411f143cc8c624a
- Child Cost Item: a0a365074631e90b253950796b2a2bdf