Tactical Bridging - Engineering Development
Abstract
This project supports the engineering and manufacturing development and transition to procurement of Future Force Bridge Systems and support equipment. Funding supports development and testing of the Bridge Supplemental Set (BSS), tests associated with the Low Rate Initial Production (LRIP) phase of the Line of Communication Bridge (LOCB) and Joint Assault Bridge (JAB). This project also funds efforts to upgrade and modernize the Bridging Product Management portfolio through the development of new systems such as the Structural Health Monitoring System, and the Family of Higher Military Load Classification Bridges (FoHMLC-B).
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2019
- Source ID
- H02_0604804A_5_2040_PB_2019
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: Joint Assault Bridge (JAB) Development and Testing
- Child Accomplishment: Line of Communication Bridge (LOCB) Development and Testing
- Child Accomplishment: Bridge Supplemental Set (BSS)
- Child Accomplishment: Family of Higher Military Load Capacity Bridges
- Child Cost Item: b202a07a4556590f22c8c74aaa19d6f8
- Child Cost Item: b41081ae50d8efe5fde3fbb6cfae5939
- Child Cost Item: e4fc72f2c0bf8960d8e2774dc2b2a2d4
- Child Cost Item: 9f2cfb0a74376fa01e81eb2b6e39511c
- Child Cost Item: d99d9bb3b4074f2acbb4b6c7a80ca2a0
- Child Cost Item: 0582cfbfdfc90ed8fdac2a63c61ad7a0
- Child Cost Item: 409217374ac44e1c13dfb94f2cf1fec7
- Child Cost Item: bc218148ac3642f3be6b9d6d2a7c90b2
- Child Cost Item: 622807e0eccb8ad4d7bfae3c9b8f3380
- Child Cost Item: 254b9afe5f1d21009d04f2f0c95e1347
- Child Cost Item: b02770e1bd5cfe9148696e9baf7727d8
- Child Cost Item: 6d064be5a798b97ff842221a6bebf607
- Child Cost Item: 454e0f075f2be7b22e8b5f53468f77ef
- Child Cost Item: a033fb0b7ef3b9d3520c325cb9316ee8
- Child Cost Item: aae76fd0d3d31cd054967a87a92f4110
- Child Cost Item: fcd368bb81bfa90884d4283b31d81e80