JB Langley-Eustis Implementation
Abstract
The intent of this project is directly related to recommendations from the Hampton-Langley Joint Land Use Study (JLUS) completed in August 2010 and Hampton-Langley Air Force Base Joint Land Use Study Addendum completed in August 2018. These studies identified the need for a new route to a new Entry Control Facility (ECF) (e.g., Transportation Implementation Action 24 – “Add a new route to a new base entry gate”). The new route is not only intended to provide a new means of access to/from the installation but also designed to be flood-secure, and thus enhancing the installation’s resiliency to the potential impact of significant rainfall or flooding events.
Document Details
- Document Type
- DoD Grant Award
- Publication Date
- Feb 04, 2020
- Source ID
- HQ00051910046
Entities
People
- Bruce Sturk
Organizations
- Office of Local Defense Community Cooperation
- Office of the Secretary of Defense