JB Langley-Eustis Implementation

Abstract

The intent of this project is directly related to recommendations from the Hampton-Langley Joint Land Use Study (JLUS) completed in August 2010 and Hampton-Langley Air Force Base Joint Land Use Study Addendum completed in August 2018. These studies identified the need for a new route to a new Entry Control Facility (ECF) (e.g., Transportation Implementation Action 24 – “Add a new route to a new base entry gate”). The new route is not only intended to provide a new means of access to/from the installation but also designed to be flood-secure, and thus enhancing the installation’s resiliency to the potential impact of significant rainfall or flooding events.

Document Details

Document Type
DoD Grant Award
Publication Date
Feb 04, 2020
Source ID
HQ00051910046

Entities

People

  • Bruce Sturk

Organizations

  • Office of Local Defense Community Cooperation
  • Office of the Secretary of Defense

Tags

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Military Engineering.
  • Wetland-Land-Environmental Management.