Fort Drum 2, Design - Installation Resilience

Abstract

The Development Authority of the North Country will engage an engineering firm for design and bidding services associated with the Fort Drum Water Line Pipeline Replacement Project. A physical analysis and assessment of the line identified critical defects in portions of the existing pipe requiring replacement. The Development Authority of the North Country owns the water line pipeline and it is a critical asset for Fort Drum in order to maintain operations.

Document Details

Document Type
DoD Grant Award
Publication Date
Sep 26, 2022
Source ID
HQ00052210013

Entities

People

  • Carrie Tuttle

Organizations

  • Development Authority of the North Country
  • Office of Local Defense Community Cooperation
  • Office of the Secretary of Defense

Tags

Readers

  • Environmental Remediation and Restoration.
  • Facility/Structural Engineering.
  • Government Contracting/Procurement.