Holloman School Complex

Abstract

"The Alamogordo Public School District is proposing a single grant request for the New Holloman PK-8 Campus. The Holloman PK-8 Campus will contain 3 main components: the PK-5 facility (currently under construction with projected completion date of October 2022), the PK-8 Outdoor Learning Studio with supporting spaces, and the 6-8 facility. The PK-5 facility was determined to be in need of replacement in the District’s 2015-2019 Facility Master Plan. Therefore, educational specifications were written in compliance with the NMPSFA adequacy standards and the facility was designed to meet those standards. The PK-5 facility is planned for 600 students and is 72,154 square feet. The 6-8 facility has a projected enrollment of 225 students with capacity for 312 students, and a planned square footage of 52,178. The PK-5 facility has been funded by NMPSCOC and District match. APS is seeking funding from OLDCC for the 6-8 facility and the Outdoor Learning Studio and site work. APS has met the 20% matching funds obligation by virtue of the contribution to the PK-5 facility."

Document Details

Document Type
DoD Grant Award
Publication Date
Feb 15, 2023
Source ID
HQ00052310005

Entities

People

  • Colleen Tagle

Organizations

  • Office of Local Defense Community Cooperation
  • Office of the Secretary of Defense

Tags

Fields of Study

  • Education

Readers

  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Marksmanship and Weaponry.
  • STEM Education

Technology Areas

  • Space