Holloman School Complex
Abstract
"The Alamogordo Public School District is proposing a single grant request for the New Holloman PK-8 Campus. The Holloman PK-8 Campus will contain 3 main components: the PK-5 facility (currently under construction with projected completion date of October 2022), the PK-8 Outdoor Learning Studio with supporting spaces, and the 6-8 facility. The PK-5 facility was determined to be in need of replacement in the District’s 2015-2019 Facility Master Plan. Therefore, educational specifications were written in compliance with the NMPSFA adequacy standards and the facility was designed to meet those standards. The PK-5 facility is planned for 600 students and is 72,154 square feet. The 6-8 facility has a projected enrollment of 225 students with capacity for 312 students, and a planned square footage of 52,178. The PK-5 facility has been funded by NMPSCOC and District match. APS is seeking funding from OLDCC for the 6-8 facility and the Outdoor Learning Studio and site work. APS has met the 20% matching funds obligation by virtue of the contribution to the PK-5 facility."
Document Details
- Document Type
- DoD Grant Award
- Publication Date
- Feb 15, 2023
- Source ID
- HQ00052310005
Entities
People
- Colleen Tagle
Organizations
- Office of Local Defense Community Cooperation
- Office of the Secretary of Defense