Nathan Twining ES/MS Grand Forks AFB

Abstract

Grand Forks Public School District #140, operating Nathan Twining Elementary and Middle School, is planning design and demolition in preparation for construction of a new, Pre K-Grade 8 elementary and middle school facility on the Grand Forks Air Force Base to meet the FCAR condition deficiencies defined by the DoD in the January 26, 2018 Facility Condition Assessment Report. This report outlining building and capacity deficiencies, along with the deficiencies identified by the LEA, warrant building replacement. This FCAR report placed Nathan Twining Elementary and Middle School #70 on the Public Schools on Military Installations Priority List. The proposed design meets state and federal design guidelines, capacity requirements, and technology needs.

Document Details

Document Type
DoD Grant Award
Publication Date
Sep 17, 2024
Source ID
HQ00052410029

Entities

People

  • Taunya Schleicher

Organizations

  • Grand Forks Air Force Base
  • Office of Local Defense Community Cooperation
  • Office of the Secretary of Defense

Tags

Readers

  • Aerospace Research.
  • Riverine Ecology
  • Software Engineering