JOINT LIGHT TACTICAL VEHICLES (JLTV) - SDD
Abstract
Joint Light Tactical Vehicles (JLTV): Funding supports the development and testing of the JLTV Family of Vehicles (FoV), which is being developed as a joint system between the Army and Marine Corps. International participation will be offered during this phase. The JLTV goal is a FoV with companion trailers capable of performing multiple mission roles that will be designed to provide protected, sustained, networked mobility for personnel and payloads across the full Range of Military Operations (RoMO). JLTV objectives include increased protection and performance over the current fleet; minimizing ownership costs by maximizing commonality, fuel efficiency and other means; and maintaining effective competition throughout the lifecycle. Commonality of components, maintenance procedures, training, etc., between vehicles and trailers is expected to be inherent in FoV solutions within and across sub-configurations to minimize FoV total ownership cost. Unique service requirements have been minimized. This is a continuation of the JLTV program which was initiated for the Technology Development Phase. Funding was provided under PE 0603804A, Project L04 for FY11 and previous years. During FY12, major budget activities are based upon an expected December 2011 Capability Development Document (CDD) approval and will support the Source Selection Evaluation Board (SSEB), multiple Engineering and Manufacturing Development (EMD) contracts, hull and ballistic coupon testing, government furnished equipment and program management support. FY12 funding increased from President's Budget (PB)11, $66.8 million, to PB12, $172.093 million as a result of requirement changes to the FoV, implementation of the Weapon System Acquisition Reform Act (point estimate to an 80% confidence cost estimate) and updated test estimates. At the request of the House Armed Services Committee - Air and Land Forces, a separate and distinct funding line (0605812A-VU9) was established for JLTV. Transition of Project L50 funding to this newly established Program Element (PE) will occur in FY13.
Document Details
- Document Type
- Project
- Publication Date
- Oct 01, 2012
- Source ID
- L50_0604804A_5_2040_PB_2012
Related Documents
- Root: Logistics and Engineer Equipment - Eng Dev
- Child Accomplishment: Program Management
- Child Accomplishment: Variant Prototype Contract Design, Development and Fabrication
- Child Accomplishment: Developmental Test and Evaluation
- Child Cost Item: f31721dafe232b97ae27180b6b8cad7a
- Child Cost Item: 799c030cc39b2d3ae7d9af717a8dbbad
- Child Cost Item: 616c36db4ce7b3dee9f746407f4ac2bd
- Child Cost Item: 408ddd60ebb98b07fd193e31983a4fc7
- Child Cost Item: 4648d86f4f2807c0de7f2d428beb87df
- Child Cost Item: eb37c48bd0fa960a7cb541f593cbf5f3
- Child Cost Item: 0ef1e259ad354fc7d299a3ccf47b1f84
- Child Cost Item: 72fdbfa23734b5a9c70d3502ad3d05e4
- Child Cost Item: 7d306024633611c93ef0cffa9b3ed19d
- Child Cost Item: 77f85b169993503c0f7894f38d5d4fc9
- Child Cost Item: 92c717ba39c1975b342ad1ee2d8180da