SM-3 Block IIA Co-Development Test

Abstract

Working with the Services' Operational Test Agencies (OTA), with the support of the Director of Operational Test and Evaluation (DOT&E), MDA has developed a test program to improve confidence in missile defense capabilities under development and ensure the capabilities transferred to the warfighter are operationally effective, suitable, and survivable. The Integrated Master Test Plan (IMTP) is event-oriented and extends until the collection of all identified data is completed to ensure adequate test investments. The bottom line is that MDA is focused on conducting meaningful ballistic missile testing that demonstrates the capabilities of the BMDS. The MDA and the Japanese Ministry of Defense conduct the SCD Project for the development and initial flight test of the SM-3 Block IIA in accordance with the jointly signed SCD Annex. The Joint signed SCD Program Schedule (dated October 2013) includes the following test events: * Restrained Firing - COMPLETE * Propulsion Test Vehicle - 1 (PTV-1) - COMPLETE FY 2014 * Controlled Test Vehicle - 1 (CTV-1) - COMPLETE FY 2015 * Controlled Test Vehicle - 2 (CTV-2) (Planned for Q1 FY16) * SCD FTM - 1 (SFTM-01) (Planned for FY16) * SCD FTM - 2 (SFTM-02) (Planned for FY17)

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2017
Source ID
MT09_0604881C_4_0400_PB_2017

Tags

Readers

  • Clinical Trial Research.
  • Missile Defense Systems.

Related Documents