Teleport Program

Abstract

The Teleport program will implement an integrated test approach that will combine the objectives from multiple testing disciplines (e.g., developmental test, operational test, interoperability, and information assurance) throughout the testing lifecycle to support needed system evaluations. The Teleport program executes its own test events to achieve this integrated approach, but will partner with each phase’s respective program office generated test activities to leverage the data needed to satisfy Teleport program test objectives. An FY 2014 approach summary for each phase follows: Phase 1: FY 2014 funding will be used to complete a system field trial, conduct a developmental regression test, conduct terminal interoperability testing, and will culminate with the Phase 1 Operational Test and Evaluation (OT&E) event in the second quarter FY 2014. Phase 2: FY 2014 funding will be used to complete terminal interoperability testing and conduct the Phase 2 OT&E evolution in the first quarter FY 2014. Phase 3: FY 2014 funding will be used to conduct developmental testing on the first gateway component installation, conduct developmental regression testing, and culminate with an OT&E of the Teleport Phase 3 integration in third quarter FY 2014.

Open PDF

Document Details

Document Type
Project
Publication Date
Oct 01, 2014
Source ID
NS01_0303610K_7_0400_PB_2014

Tags

Readers

  • Aerospace Test and Evaluation
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Software Engineering

Related Documents