Air Vehicle Follow-on Development

Abstract

Includes disciplined systems engineering, requirements decomposition, and life cycle cost estimation of high priority, gap-driven Block 4 candidates to inform investment optimization decisions; technical development activities on suitability candidates that address system limitations identified during Operational Assessments of F-35; maturing validated Block 4 Follow on Development (FoD) capabilities to the appropriate Technical Readiness Levels (TRL) to reduce integration risk for inclusion into the EMD program planned to begin in FY15.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
a149f6e8dda2c405cefff82bfd0972d1

Tags

Fields of Study

  • Computer science
  • Engineering

Readers

  • Life Cycle Cost Analysis
  • Military Science and Technology Research and Modernization.
  • Naval Mine Countermeasure Systems Development.

Related Documents