XLUUV Product Development
Abstract
Orca XLUUV Phase 1 design was completed via a full and open competition with two industry teams. Phase 2 fabrication was down selected to one vendor for the fabrication and delivery of 5 Orca vehicles and an additional test and training asset (Vehicle 0) was added for risk reduction. In March 2022, the Navy added a test/training asset (XLE0) and test/ fix/test level of effort (LOE) period to reduce risk of achieving performance requirements and future delivery schedule of the JEON vehicles.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2024
- Source ID
- a71e25b5f3396092153094af3e1cba6b