Technical Baseline Management and System Integration

Abstract

Perform Government as system integrator function through acquiring, designing, testing, and integrating key prototype segments and interfaces. Mature technical baseline and interface requirements for the prototype system. Conduct architectural engineering and system level integration planning for the PTS space, ground, and gateway segments. Support, configure, and conduct integrated testing of the major PTS subsystems, segments, and end-to-end prototype system. Manage the PTS open system architecture, refine interface requirements, and validate concept of operations through integrated system performance demonstrations. Beginning in FY 2021, the Space Hub End Cryptographic Unit (ECU) will be a separate thrust as a key risk mitigation project.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2022
Source ID
a93c88bd07f467bf129b4a450ef20833

Tags

Fields of Study

  • Computer science

Readers

  • Aerospace Engineering.
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.

Technology Areas

  • Space

Related Documents