C4ISR SYSTEMS ENGINEERING
Abstract
FY 2009 and prior, funding for this effort was budgeted in PE 0604231N, Tactical Command System, Project 9123 (FORCEnet). In addition, sub projects C4ISR Architecture and Standards, Distributed C2 Interoperability Requirements Analysis, and End-To-End System Engineering and Integrated Design are combined under C4ISR Systems Engineering in FY 2010 and out.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2011
- Source ID
- aaa41f3f55b3d722853f15fae25a3311