DARC Site 1 Operational Capability
Abstract
The DARC MTA activity will develop, test, and deliver one DARC site with a current estimated completion date of CY 2025. It will also provide a foundation for up to two more future sites located strategically around the world to provide global deep space radar capability to support SDA. The system will be responsive to regularly scheduled and un-scheduled tasks to locate, identify, characterize deep space objects and report the results to Battle Management Command and Control locations and SSN.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2025
- Source ID
- abf92ee638e5b97f8031245facf14ede