Producibility Enhancement/Performance Improvement (PE/PI) Contractor Flight Test (Annex D)

Abstract

Continuation of contractor testing of new capabilities as required. Costs include maintenance on the test aircraft, engine overhaul of the flight test aircraft unique engines, contractor engineering support for test related technical and safety of flight issues, test planning, test analysis and test execution.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
ac97783e9ba1e3a6195b68b83be7c1e9

Tags

Fields of Study

  • Engineering

Readers

  • Aerospace Engineering
  • Aerospace Engineering.

Related Documents