Producibility Enhancement/Performance Improvement (PE/PI) Contractor Flight Test

Abstract

Continuation of contractor testing of new capabilities as required. Costs include maintenance on the test aircraft, engine overhaul of the flight test aircraft unique engines, contractor engineering support for test related technical and safety of flight issues, test planning, test analysis and test execution.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
ae2d7cdf1d12929523b4f1ab565eaac8

Tags

Readers

  • Aerospace Engineering
  • Aerospace Engineering.
  • Aerospace Test and Evaluation

Related Documents