GCCS-AF Synchronization, Integration, Test, and Planning
Abstract
This effort consisted of: synchronization, integration and testing of current/upgraded capabilities; operational baseline problem analysis and technical solution implementation; and systems engineering for infrastructure migration to the next generation joint C2 architecture.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2015
- Source ID
- af431e15fcea93508fcb5cdc4f1c0246