Land Based SM-3 Site Activation

Abstract

Provide site design, unexploded ordnance clearing; spectrum analysis studies; temporary facilities; utilities; administrative communications equipment and services; infrastructure modifications; generator and commercial power; leased vehicles; material handling equipment; generator fuel; supplies, barriers temporary lighting; transportation of materials and equipment; translators; and emerging requirements as site activation progresses and until sites are transferred to the Navy. Recurring Accomplishments include: -Provide site activation for Aegis Ashore site in Poland to include temporary site activation facilities, base operation support, utilities, administrative communications, on-site material handling equipment services, and equipment installation -Fuel for facility commissioning activities, backup generators, and on-site vehicle support -Technical support to facilitate processing facility change proposals and construction modifications -Post-award technical services (structural, mechanical, and electrical) to ensure quality standards and construction schedule is met

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2020
Source ID
af8f59409e42ff58329d2ff828e2e567

Tags

Readers

  • Electrical Engineering
  • Facility/Structural Engineering.
  • Software Engineering

Related Documents