Infrastructure Systems Repair, Sustainment, and Critical Upgrades

Abstract

RECURRING: - Heating, Ventilation, and Air Conditioning end-of-life component replacement and capacity upgrade to improve mission assurance to critical mission areas within Building 720 (one quadrant) - Fire Suppression System Compliance Project (two quadrants) Specific and/or unique accomplishments to each FY are as follows:

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2019
Source ID
b8be959da2291f5f852949e50ab08ca2

Tags

Readers

  • Aerospace Engineering
  • Facility/Structural Engineering.
  • Fire Suppression Systems Design.

Related Documents