MULTI-PURPOSE BOMB RACK TESTING

Abstract

The MPBR testing will include ground (aircraft and test stand) and flight integration testing. These efforts will begin prior to delivery and will occur throughout the EMD efforts of this rack. They will begin with prototype design coordination, initial test planning and will progress to ground and flight test events.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2011
Source ID
bfa770c427c8c7bd6595f33a7b15dbec

Tags

Fields of Study

  • Physics

Readers

  • Aerospace Engineering
  • Aerospace Test and Evaluation

Related Documents