Product Development

Abstract

MQ-4C Triton Unmanned Air System (UAS) modernization effort for incorporation of phased capability upgrades. The prime contractor is responsible for integration of upgrades into the Triton UAS including associated management, engineering and logistics activities. Capability upgrades will also include development of system payloads directly with original equipment manufacturers.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2017
Source ID
bff2c30aed54c22974dfc80d53c32389

Tags

Fields of Study

  • Physics

Readers

  • Life Cycle Cost Analysis
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Technology Areas

  • Autonomy

Related Documents