Payload Integration
Abstract
Continue STP-5 planning, integration and design activities (SIRI-III, PNTOC, and SCO-1 payloads). Continue STPSat-8 integration and design activities (STEP 2.0 (Space Test Experiment Platform)). Conduct payload integration of STP-H9, STP-H10, STP-28AR1, and STP-Sat7. Begin design for future ISS missions. Complete satellite acquisition and integration of STPSat-7 and its ground systems. Complete STP-H11 design activities and begin integration activities. Conduct STP-S29 technical analysis and payload integration rideshare. Initiate STP Small Launch STP-S30 (every 2 yrs) Mission Unique and Integration Costs. Collaborate on technical analysis and other future missions as required. Rapidly respond to implement system resiliency and situational awareness necessary to operate in the contested space domain. Activities may include, but are not limited to program office support, studies, technical analysis, experimentation, prototyping, etc.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2024
- Source ID
- c1ce048b743f26faea2f25350d97e5cc
Related Documents
- Root: Space Test Program (STP)