CH-47F Block II Engineering and Manufacturing Development (EMD)
Abstract
Conduct and support aircraft development, complete assembly and deliver three EMD test articles to include airframe components, Improved Drive Train (IDT), rotor components, light weight fuel system, electrical components and the currently fielded Fiberglass Rotor Blade (FRB). Complete fabrication, assembly, initial functional checks of the Ground Test Vehicle (GTV) and remote control system (RCS), conduct GTV test operations, functional testing of the CH-47F Block II systems, Test Readiness Review (TRR) for EMD ground and flight testing. Release EMD flight test software. Begin contractor led system level ground and flight testing. Deliver documentation that demonstrates requirements verification and production configuration baseline. Continue Integrated Logistics Support (ILS) and Integrated Contractor Supply (ICS) support for initial flight test activities. Shut down all ACRB efforts and terminate the associated contracts.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2023
- Source ID
- c1ddea5ca356bbba68cb760fc79bc03e