Gap and Integration Analysis
Abstract
Funds will be used for studies to facilitate new capabilities and enhancements to improve operational aircraft safety, supportability, maintainability, reliability and total ownership cost. Conduct engineering studies that will involve a gap and integration analysis to include but not limited for Small Diameter Bomb (SDB) II Integration with Universal Armament Interface (UAI), Guided Bomb Unit (GBU)-56 Integration, Miniature Air Launch Decoy (MALD) Integration (All variants), Conventional Mission Upgrade Program (CMUP) and Helmet Mounted Cueing System. Funding is also required to ensure test asset availability for testing of aircraft RDT&E efforts. Costs include Program Management Administrative (PMA) costs and Acquisition Support costs.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2021
- Source ID
- cb47cdb575781969e407d9ce8bb02e35
Related Documents
- Root: B-1B Squadrons