Standard Missile-3 (SM-3) Block IIA Development

Abstract

The SM-3 Block IIA is required to meet EPAA Phase III. It will increase the area that can be defended by Aegis BMD, increase the probability of kill against a larger threat set, and leverage enhanced capability provided by BMDS sensor upgrades. Recurring Accomplishments: - Conduct SM-3 Block IIA software update to support engagements against additional complex threats identified during Aegis BMD 5.1 design process conducted after missile Critical Design Review (CDR) - Conduct End to End Distributed Development System (ETEDDS) integration testing; and flight test support - Continue implementation of SM-3 Block IIA cost reduction initiatives to support meeting cost goals to reduce the current estimated Average Unit Production Price (AUPP) Specific and/or unique accomplishments to each FY are as follows:

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2019
Source ID
cb944549df064259621007df26daf2d1

Tags

Readers

  • Life Cycle Cost Analysis
  • Missile Defense Systems.

Related Documents