Contractor Prototypes
Abstract
Provides for procurement and fabrication of subsystem test assets required by the Technology Development (TD) contract and for system level prototypes planned in the EMD phase. Does not include material consumed in support of component level engineering efforts.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2014
- Source ID
- cccedaca4982b5261ff21c95443e5ba2
Related Documents
- Root: Manned Ground Vehicle