Site Activation

Abstract

This effort includes site design; environmental studies; unexploded ordnance clearing; spectrum analysis studies; temporary facilities; utilities; administrative communications equipment and services; infrastructure modifications; generator and commercial power; leased vehicles; material handling equipment; generator fuel; supplies, barriers; guard shacks; temporary lighting; transportation of materials and equipment; translators; and emerging requirements as site activation progresses and until sites are transferred to the Navy. Recurring Accomplishments include: - Provide site activation for Aegis Ashore site in Poland to include temporary site activation facilities, base operation support, utilities, administrative communications, on-site material handling equipment services, and equipment installation - Conducted activities listed in Description section (above) - Continue providing fuel for facility commissioning activities, backup generators, and on-site vehicle support - Continue providing technical support to facilitate processing facility change proposals and construction modifications - Continue providing post-award technical services (structural, mechanical, and electrical) to ensure quality standards and construction schedule is met - Continue providing Defense Threat Reduction Agency (DTRA) support to ensure High-Altitude Electromagnetic Pulse (HEMP) validation and verification testing is completed Specific and/or unique accomplishments to each FY are as follows:

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2019
Source ID
ce1df8e7e24ad14e0c1cf2e5d62ac01c

Tags

Readers

  • Energy Conservation and Renewable Energy Engineering.
  • Environmental Impact Assessment (EIA) of Proposed Air Force Base Actions.
  • Software Engineering

Related Documents