PTS Engineering and Manufacturing Development (EMD) Phase
Abstract
Continues PTS EMD Acquisition Planning, previously included in the PTS-P Design and Development Major Thrust (FY 2023). Beginning in FY 2024 it was separated as its own Major Thrust. FY 2024 will initiate the EMD phase for PTS space, ground, and gateway segments and key system components. Develop, build, test, and evaluate next PTS payloads to support hosted or free-flyer configurations available for launch in FY 2029. Includes payload and bus control development/upgrades at the operating centers. Deliver Initial Operational Capability (IOC) for protected communications against threats in FY 2030 with operational payloads. Continue to mature PTS concept of operations with user participation.