Producibility Enhancement/Performance Improvement (PE/PI) Government Flight Test

Abstract

Continuation of the direct costs of flight testing. The costs include ramp space, fuel, air traffic control, range costs, etc., which are items each weapon system must pay for when using Air Force flight test locations.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
d117a4091b0e4e04878d0fbaee14b36b

Tags

Readers

  • Aerospace Engineering
  • Aerospace Engineering.
  • Aerospace logistics and air mobility.

Technology Areas

  • Space

Related Documents