Prototype Upgrade to LRIP Configuration

Abstract

After a successful Milestone C, eight (8) prototype vehicles will be updated to the initial LRIP configuration to support LRIP phase survivability testing, logistics products development, and implementation of design changes driven by Production Qualification Testing (PQT) and Initial Operational Test and Evaluation (IOT&E). Upgrading MPF prototypes to LRIP configuration will result in substantial cost avoidance compared with producing additional LRIP vehicles to support test requirements.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2023
Source ID
d34439ecccac055d559d40a8da261018

Tags

Fields of Study

  • Computer science

Readers

  • Civilian Systems Systems Program Capability Development and Upgrade Support Activity Expense and Pay Management.
  • Munitions and Ordnance Engineering

Technology Areas

  • 5G
  • 5G - DoD 5G Program
  • 5G - Internet of Things

Related Documents