GPS III SV11+ (Production Readiness)
Abstract
USD(AT&L) approved the first phase of a two-phased GPS III SV acquisition strategy starting no earlier than SV11. The strategy utilizes FY 2015-2017 RDTE funding for the Phase 1 effort to mature three contractors' GPS III production designs. The Phase 1 Production Readiness Feasibility Assessment is providing data and insight into contractors GPS III Production Design with emphasis on a mature navigation payload and production-ready designs. Phase 1 requires contractors to provide a GPS III space vehicle and navigation payload production designs, manufacturing plans, and a navigation payload engineering brass board (hardware).