Integration and Test (I&T) Integrated Product Team

Abstract

The Integration and Test (I&T) Integrated Product Team (IPT) develops and executes the test plan to assess the FTS operational capability, performs risk reduction testing leveraging various component system tests. Test data will be used over time to verify, validate, and accredit the FTS simulation federation.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2016
Source ID
d4f9ae293648fde96c6b3b6da4262af8

Tags

Readers

  • Aerospace Test and Evaluation
  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.

Related Documents