CH-47F Block II Engineering and Manufacturing Development (EMD)
Abstract
Conduct and support aircraft development, complete assembly and deliver three EMD test articles to include airframe components, Improved Drive Train (IDT), Improved Rotor System (IRS), light weight fuel system, electrical components and the currently fielded FRB. Complete fabrication, assembly, and initial functional checks of the Ground Test Vehicle (GTV) and remote control system (RCS); conduct GTV test operations, functional testing of the CH-47F Block II systems, and Test Readiness Review (TRR) for EMD ground and flight testing. Release EMD flight test software. Perform contractor led system level ground and flight testing. Deliver documentation that demonstrates requirements verification and production configuration baseline. Continue Integrated Logistics Support (ILS) and Integrated Contractor Supply (ICS) support for initial flight test activities. Shut down all ACRB efforts and terminate the associated contracts.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2024
- Source ID
- d6c85d40bc9150a93b8ba825a1d05e58