JCC (X)

Abstract

Budgeted funds provides the afloat/ashore command and control (C2) preliminary design and feasibility study efforts.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2011
Source ID
d7b6203f4b68939698608c60cb39816d

Tags

Technology Areas

  • Fully Networked C3
  • Fully Networked C3 - Command and Control

Related Documents