Logistics Support

Abstract

Received/controlled/distributed/tracked Program/Product Manager (PM) test assets; maintained/repaired/replaced/upgraded test floor; procured test equipment.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2013
Source ID
d8c44f74f2bdbef877dfe1b238594d03

Tags

Fields of Study

  • Engineering

Related Documents