Release 1 and Release 2
Abstract
Release 1 and Release 2 continue execution of a subset of work previously performed under the System Developmemt and Demonstration (SDD) effort, while rapidly integrating upgrades or improvements (including limited urgent needs) fleet-wide. Development will combine the rigor of an event driven development process (referred to as a Technology Maturation Effort (TME)) with the expeditious delivery of a schedule driven integration and fielding process (referred to as a Release). These efforts may include, but not limited to: TOLD, MTS-B Integration, GCS Block 50, Counter IED, IP Migration, SAR Development, GCS Block 30, Extended Range Phase I, Extended Range Phase II, Extended Range Accel, Enablers Development, Multi Transit Ops, software development required to support new capabilities.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2018
- Source ID
- df64f7104e5d574f51adc9b15c36d9d4
Related Documents
- Root: MQ-9 UAV