Product Development - LRIP Phase Contractor Technical Support to Government Test

Abstract

M10 Booker Low Rate Initial Production (LRIP) phase development activities for Contractor Technical Support to Test include purchase of the spare parts for LRIP phase testing, root cause analysis and the development of corrective actions on test incidents, training of vehicle operators at U.S. Government test sites, initiation of vehicle lethality, survivability, and weight reduction integration efforts, and integration of system design changes informed by user feedback. Efforts also include Systems Technical Support (STS) in the form of test configuration updates to M10 Booker vehicle subsystems and field service representatives at U.S. Government test sites to perform M10 Booker vehicle maintenance.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2025
Source ID
e1f89207247424497d87582cfeb5b7d2

Tags

Readers

  • Life Cycle Cost Analysis
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Related Documents