Product Development - LRIP Phase Logistics Products

Abstract

MPF Low Rate Initial Production (LRIP) phase development activities for logistics products include Technical Manual (TM) and Training Support Package (TSP) updates, verification and demonstration of supportability tasks, evaluation of incidents during performance testing for supportability impacts, continued development of National/Depot Maintenance Work Requirements (NMWR/DMWR), continued execution of Level of Repair Analyses (LORA) and Source of Repair Analyses (SORA), the provisioning of spare parts, supportability analysis of operator and maintenance tasks, and management of the Integrated Logistics Support (ILS) program.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2024
Source ID
e54be65f2415673057298eba4d37f732

Tags

Fields of Study

  • Engineering

Readers

  • Instructional Design and Training Evaluation.
  • Logistics and Supply Chain Management.
  • Unmanned Aerial System (UAS) Autonomous Capabilities and Mission Reconnaissance.

Related Documents