Rapid Rigging and DeRigging Airdrop System (RRDAS) Phase I

Abstract

Reduces rigging times while also providing the capability to rapidly de-rig loads on the drop zone. This will reduce the lead time to prepare Low Velocity Airdrop System (LVADS) loads while also increasing the survivability of receiving ground forces by ensuring the airdrop loads (to include weapon systems, prime movers, trailers, etc.) are quickly de-rigged and made operational. RRDAS is a three phase Research, Development, Testing and Engineering (RDT&E) effort, Phase I will focus on loads up to 20,000 pounds and platform lengths up to 20 feet and will include prime movers such as HMMWV.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2019
Source ID
e86178816fc4ac735f094e89a0fc886b

Tags

Readers

  • Logistics and Supply Chain Management.
  • Military Science and Technology Research and Modernization.

Related Documents