Test & Evaluation
Abstract
Test and Evaluation to support the ECP 1A program will occur in two phases: Production Prove-out Testing (PPT), FY2015 - FY2018, and Production Qualification Test (PQT), FY2018 - FY2020. Contractor testing will be conducted in a structured environment determined by the Original Equipment Manufacturer (OEM). Government testing will be conducted by the U.S. Army Test and Evaluaton Center (ATEC).