Technology Maturation and Risk Reduction (TMRR)
Abstract
JSTARS Recap TMRR Contract activities leveraged DoD prior investments and Industry's Independent Research and Development (IR&D) investments to conduct technical reviews and subsystem prototype demonstrations. TMRR activities assessed industry's system-level design readiness/maturity with respect to top integration risks and use of Open Systems Architecture (OSA) and Open Mission System (OMS) standards. The TMRR contract activities informed the Government about the integration complexity and associated lifecycle risks involved with different system-level design solutions, including radar risk reduction. Activities also include studies, analyses, and risk reduction addressing all subsystems to support current program planning/execution and future program planning. These activities informed the Engineering, Manufacturing and Development with Production (add better words) Request for Proposal released 26 Dec 16.
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2019
- Source ID
- eb76868bc8dca3a593310f65852db1dc
Related Documents
- Root: JSTARS Recap