Phase 3 CIRCM QRC OCO
Abstract
Phase 3 CIRCM QRC will achieve a reduction in Size, Weight, and Power (SWaP).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2021
- Source ID
- ebe5cf7f7c3c3a911cd1b39fa5262044
Phase 3 CIRCM QRC will achieve a reduction in Size, Weight, and Power (SWaP).