LATR
Abstract
Design, integrate and test modules to eliminate obsolete components in the Large Area Tracking Range (LATR) Pod. Design, integrate and test LATR software baseline upgrades. Design, integrate and test Participant Instrumentation Packages (PIP) modules to address obsolescence, high failure components and to improve operability and performance. Conduct and complete installation of the Ground System Rehosts. Conduct and complete security testing and assessment for LATR system certification and accreditation for Ground System Rehosts. Develop, test and integrate software and hardware modifications to system test sets. Develop, test and integrate LATR data translators. Conduct studies to identify sub-projects required through FY25. Complete ground system and PIP refresh sub-projects, in conjunction with, semi-annual system block upgrades. Conduct LATR Operational Security (OPSEC) Posture Improvements Sub-Project, Shipboard and Rotary Wing Technology Wing Upgrade (LSRTU) and LATR Navigation Technology Refresh (LNTR).
Document Details
- Document Type
- Accomplishment
- Publication Date
- Oct 01, 2023
- Source ID
- ec694e7eb12c65997c70edf62bfd0f07