Multi-Purpose Bomb Rack Testing

Abstract

The MPBR testing will include ground (aircraft and test stand) and flight integration testing. These efforts will begin prior to delivery and will occur throughout the Engineering and Manufacturing Development (EMD) efforts of this rack. They will begin with prototype design coordination, initial test planning and will progress to ground and flight test events.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2012
Source ID
ee2a14af8d208c5bccfb80179bb212a4

Tags

Fields of Study

  • Physics

Readers

  • Aerospace Engineering
  • Economics
  • Software Engineering

Related Documents