GTCP36 Auxiliary Power Unit (APU)

Abstract

Provide timely responses to technical problems arising in the field during operational use. Review operational and repair reports, perform engineering analysis of failed engines and equipment. Perform investigation and testing as required to isolate/verify reported field problems and service revealed deficiencies (SRDs).

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2016
Source ID
f37f6e938c6344381ad8653681f4c3ad

Tags

Fields of Study

  • Engineering

Readers

  • Electrical Engineering
  • Systems Analysis and Design

Related Documents