Protected SATCOM Services (PSCS) AoA

Abstract

The Joint Requirements Oversight Council (JROC)-approved release of the 28 Sept 2010 Joint Space Communications Layer (JSCL) Initial Capabilities Document (ICD) drove the FY2011 Resilient Basis for Satellite Communications in Joint Operations Study (RBS). Results of the RBS Study, briefed to the Defense Space Council (DSC), revealed that current protected satellite communications services did not meet all of the JSCL ICD requirements, to include the North Polar region. With capability gaps identified, lack of a post Enhanced Polar System (EPS) plan, and a need to determine how best to provision for protected MILSATCOM beyond the sixth AEHF satellite, the DSC recommended this Analysis of Alternatives (AoA) effort.

Document Details

Document Type
Accomplishment
Publication Date
Oct 01, 2015
Source ID
f3c71071893b0d1468152d6d4cc7cf7f

Tags

Readers

  • Enterprise Information Systems Architecture and Joint Command Capability Interoperability Support.
  • Government and Public Administration Law.
  • Tactical Satellite Communications Systems Engineering.

Technology Areas

  • Space
  • Space - Satellites

Related Documents